Skip links

PROJECTS

McCarthy & Stone Assisted Living at Alton

Proud to be part of this award winning Seal of Excellence project for prestigious developers McCarthy & Stone.

This award winning Assisted Living block comprising 56 one and two bedroom apartments, commercial kitchen servicing the bistro and dining room, was completed in line with tight deadlines in August 2018 for McCarthy & Stone.

This project won the Regional SW NHBC award for McCarthy & Stone in the Large Builder category and a Seal of Excellence in September 2018.

Design and Installation of Electrical Services throughout the 31,000sq ft building to provide an efficient high-end finish for a future tenant.

Refurbishment carried out for a local Developer and client who has carried out many similar projects over a 15 year period working as a team to deliver high-end projects.

 

Works include:

  • New LED Lighting throughout the building
  • Lighting Control the the Office and core areas
  • New Local Split Lighting and Power Metered Distribution Boards
  • CAT A small power ready for CAT B Tenant fit out
  • Addressable Fire Alarm System
  • Disabled Refuge System
  • CCTV Installation
  • Access Control System to all floors and reception
  • Intruder Alarm System
  • New Car Park Entry & Exit Barriers
  • External LED Lighting Columns and Bollards controlled by timelock and photocell
  • 7 Twin Electric Car Charging Points
  • Hook-up point for future generator
  • TV Distribution Network
CONTACT US

We pride ourselves on our excellent customer care and after sales service.

Part of industry recognised health and safety schemes SMAS and Constructionline Gold.

CONTACT US
homepage_community_followers